APC Start-UP Service
Installation / configuration (for UPS and power devices) | on-site | business hours | for P/N: G35TBXR2B6, G35TBXR6, G35TBXR6B6, G35TEFBXR6, G35TXR2B6, G35TXR6B6, ISVTOPT2
More like this
In this category:
Main Specification
| Product Description | APC Start-UP Service - installation / configuration - on-site |
|---|---|
| Type | Installation / configuration |
| Location | On-site |
| Service Availability | Business hours |
| Class of Equipment | UPS and power devices |
| Designed For | P/N: G35TBXR2B6, G35TBXR6, G35TBXR6B6, G35TEFBXR6, G35TXR2B6, G35TXR6B6, ISVTOPT2, SUVTBXR2B6S, SUVTBXR6B6S, SUVTXR2B6S, SUVTXR6B6S |
General
| Location | On-site |
|---|---|
| Service Availability | Business hours |
| Class of Equipment | UPS and power devices |
Details
| Service & Support | Installation - on-site - availability: business hours - 1 incident Configuration - on-site - availability: business hours - 1 incident Technical support - inspection - on-site |
|---|
Compatibility Information
| Designed For | P/N: G35TBXR2B6, G35TBXR6, G35TBXR6B6, G35TEFBXR6, G35TXR2B6, G35TXR6B6, ISVTOPT2, SUVTBXR2B6S, SUVTBXR6B6S, SUVTXR2B6S, SUVTXR6B6S |
|---|
Product features
Functional verification
During each Preventive Maintenance visit, our Certified Field Service Engineers will run tests to verify your system is functioning correctly in all operational modes, stopping problems before they start.Installation verification
Once the equipment is assembled, an APC Certified Field Service Engineer will verify all connections within the system have been made according to factory specification, and that it is functioning correctly in all modes of operation, ensuring optimal performance and extending the life of the product.Labor and travel expenses included
Travel and labor expenses are included in most service contracts. Please see the statement of work for the service specifics.Logistics coordination
APC will coordinate the logistics of your installation, from hardware delivery to scheduling installation technicians, ensuring a smooth installation process from start to finish.Written summary report
APC project managers will provide you with written reports to keep you informed of the progress of your project.Key selling points
- Installation verification
- Logistics coordination
- Written summary report
References
MPN: WSTRTUP-G3-25
What our Customers think about us!
Page generated at:
04/06/2026 20:31:41